Integrations · Monday.com
Connect Monday.com, then copy your boards into Taskory once, or link a project to one board so changes sync both ways.
Import or sync
You can do both: import a board, then link the project to it. Tasks you already imported from the board are matched up, so nothing is duplicated.
Before you start
Connect
1Select Integrations in the toolbar on the right of the screen.
Integrations2On the Monday.com card, select Connect.
Before you connect Monday.com
Taskory isn't pre-approved on the Monday.com marketplace yet, so a workspace admin needs to install our app on your board before the connection can complete.
Setup steps
If your admin has already installed the app, you can continue straight to connecting.
3Check that Taskory's app is installed. If it isn't, ask a Monday.com workspace admin to open Install the Taskory app on Monday.com.
4Select Continue to connect.
Continue to connect5In the Monday.com sign-in window, sign in and allow access.
Monday.com connected
Import your boards now to bring your tasks into Taskory.
You'll know it worked when you see a Monday.com connected box. A Super Admin or Admin can select Import now to start importing. Select Later to close the box. A Member sees the box too, but only a Super Admin or Admin can import.
Importing later
To import later, select Import boards on the Monday.com card.
Import
The import has 4 steps: Select, Target, Mapping and Review. By default, Taskory lays out each board like this:
Step 1
A board you imported before carries a Previously imported tag.
Step 2
Taskory proposes a layout: each Monday.com workspace becomes an account, each board a project, and each board group a sprint.
A board you imported before is pointed back at the project it went into last time. Only accounts and projects of your own organization are offered. How many client accounts and projects you can have depends on your plan. If an import would create more than your plan includes, choose Existing account or Existing project instead. On a Monday.com workspace, New account shows a lock when you can't add another.
Step 3
Taskory suggests which task detail each board column fills, such as the title, assignee, due date, status or priority. You check and change the suggestions.
One column must fill the task title. Reset to suggested undoes your changes.
Step 4
Each board shows how many items will be imported with your choices. Subtasks import in addition to that number.
Drafts
A complete task needs a project, an assignee and a due date. These items arrive as drafts in your Inbox instead of tasks:
You confirm each draft as a task.
Check it worked
Troubleshooting
The Import boards button is greyed out
Only people who manage integrations can import, which means a Super Admin or an Admin. Ask one of them to run the import.
The Monday.com sign-in doesn't finish
This usually happens when Taskory's app isn't installed on your Monday.com account yet. Ask a Monday.com workspace admin to install it from the link in the Before you connect Monday.com box, then connect again.
Start import stays greyed out
Choose a Fallback assignee first. If you see "1 row names more than one person. Choose who it is assigned to.", select Show the row to answer and pick one person for each row. A task in Taskory has one assignee, so the import asks instead of guessing.
You see "An import is already running for Monday.com. Wait for it to finish before starting another."
Only one Monday.com import runs at a time. Wait until the first one ends.
You see "Import finished with some errors"
The list shows up to 10 failed items and why. Select Retry failed only to try the failed items again.
Importing again
Yes. Import it into the same project to add only the items that are new on the board.
Limits
Two-way sync
Two-way sync links one Taskory project to one Monday.com board, so changes made in either place show up in the other. Connect Monday.com first, as above. Then a project admin links the project:
1Go to Accounts and open the client account.
2Select the Projects tab.
Projects3Open the project's menu and select Two-way sync.
Link Website relaunch to Monday
Changes made in either place show up in the other.
4Choose the Monday account and the Board, then select Next.
5Under Match the columns, check where each board column goes, then select Next.
6Under Confirm, select Link board.
Link boardLinked. Changes now sync both ways. Press Refresh to bring in the items already on the board.
Website relaunchSyncing
Never refreshed
7Select Refresh to bring in the items already on the board.
You'll know it worked when you see "Linked. Changes now sync both ways. Press Refresh to bring in the items already on the board." and a green Syncing tag beside the board's name.
One board, one project
A project syncs with one board, and a board with one project. To switch a project to a different board, stop syncing first.
Two-way sync
Two-way sync
The Match the columns step uses the same column list as the import. Every board column is listed, and the columns Taskory matched for you come first, under Matched for you.
To change the columns later, a project admin opens Two-way sync, selects Change columns, then Save columns.
Two-way sync
Two-way sync
Items on the board become tasks in the project. Tasks made in Taskory stay in Taskory unless a project admin sends them.
A board item with no assignee goes to a project admin. An item with no due date gets a temporary one, 7 days after it arrives, marked Placeholder date. Monday doesn't see that date until someone sets a real one. A comment on the task says what was missing.
Two-way sync
Changes sync on their own. Changes on the board come into Taskory as they happen, and your changes in Taskory go to the board.
Before you link
Stop syncing
Nothing is deleted. Tasks stay in Taskory and items stay on the Monday board, but changes no longer sync between them. If you link the same board again later, tasks that came from the board are matched up again. Tasks you sent from Taskory aren't: sending one again adds a second item to the board, and selecting Refresh brings those items in again as new tasks.
Troubleshooting
You see "Syncing with Monday is paused because the Monday connection needs to be reconnected."
Reconnect Monday.com on the Integrations page. Then a project admin opens Two-way sync and selects Resume.
You see "Syncing with Monday is paused because this project has no admin."
Changes made by people outside the project need a project admin to act for them. Add a project admin to the project, then select Resume.
The sync box says syncing is paused because of the plan
Two-way sync depends on your plan. Edits made in Taskory meanwhile are kept. Once your plan includes two-way sync, a project admin opens **Two-way sync** and selects **Resume**.
You see "Status isn't syncing because its Monday column was removed."
Someone removed that column from the board. Add the column back on the board, then select Refresh.
A task says "Monday status "Stuck" doesn't match any Taskory status, so this task stays In Progress."
That label isn't mapped to a Taskory status. A project admin selects Change columns and picks a status for the label.
You see "Subitems not mapped."
Subtasks don't sync until the subitem columns are mapped. A project admin selects Map subitems.
You see "This account cannot see any boards. Ask the board's owner to invite it, then choose it again."
The Monday account you chose can't see any boards. Ask the board's owner on Monday.com to invite that account, then choose it again.
You see "That board already syncs with another project. A board can sync with one project at a time."
Stop syncing on the other project first, or choose a different board.
Questions
No. An import is a one-time copy of the board. To keep them in step, a project admin links the project to the board with Two-way sync.
By default each board group becomes a sprint, named after the group. You can send a board's items to the Inbox as drafts, an existing sprint or a new sprint instead.
Yes. Subitems become subtasks and updates become comments. Both are ticked by default, and you can untick either one before you start.
No. A Taskory task has one assignee. When a board item names more than one person who is in Taskory, the import asks you who the task is for.
A Super Admin or an Admin. Any member can connect their own Monday.com account, but only people who manage integrations can import.
No. Only tasks that came from the board, or that a project admin sends there, go to the board. Their subtasks go with them. Everything else in the project stays private.
No. A project syncs with one board, and a board with one project.
No. Tasks stay in Taskory and items stay on the Monday board. Changes just stop syncing between them.
Next: Taskory integrations: what you can connect. More help articles are in the Help Center.
Keep reading


Create account
One live record for every client, shared with your team.
Free to start, no credit card.